How much electrode or wire does a weld actually need, and what will it cost? This free welding calculator answers both for fillet welds and single-V butt welds.
For a fillet weld the leg size is the distance from the root to the toe along each plate, and the weld cross-section is a right triangle with that leg on both sides. For a butt weld the groove is a single V with full penetration: the two bevelled faces, the root gap and the reinforcement cap above the plate surface all add weld metal, so all four dimensions matter.
Deposition efficiency is the share of the electrode or wire that ends up as weld metal: the rest is lost to stub ends, slag and spatter. Typical published values are 60-65% for SMAW, 92-99% for GMAW and 94-97% for GTAW. The price is a placeholder: replace it with your supplier's price per kilogram, or clear it to hide the cost.
Enter all three values to see the arc energy and the heat input per millimetre. Clear any one of them to hide the heat input rows. Travel speed is the weld length divided by the arc time: 300 mm welded in one minute is 300 mm/min.
Please enter values above 0 for the weld length and the joint size.
| Process | Deposition Efficiency | Electrode / Wire Consumed | Estimated Cost |
|---|
Each row uses the same joint and weld length entered above, with only the process changed. Stick welding buys the most electrode for the same weld because of stub ends and slag; MIG and TIG lose far less of what is bought.
Founder & CEO, Techraxy
Faiq Ur Rahman is a web designer, digital product developer, and Founder of Techraxy, a growing platform of online calculators and utility tools. He specializes in building structured, user-friendly tools focused on finance, health, conversions, productivity, and everyday problem-solving. He is passionate about developing practical digital solutions that make complex tasks simpler for users worldwide.
User Ratings:
ADVERTISEMENT
ADVERTISEMENT
How much electrode or wire does a weld actually need, and what will it cost? This free welding calculator answers both for fillet welds and single-V butt welds. Enter the joint size and weld length, pick the process (SMAW stick, GMAW MIG or GTAW TIG), and it shows the weld metal volume and weight, the electrode or wire to buy after deposition efficiency, the estimated cost, and, if you enter the voltage, current and travel speed, the arc energy and heat input per millimetre.
A welding calculator turns the geometry of a joint into material weight, consumable weight and cost. The first step is the cross-sectional area of the weld. A fillet weld is a right triangle, so its area is half the leg size squared. A single-V butt weld is more involved: the two bevelled faces form two triangles, the root gap adds a rectangle, and the reinforcement cap above the plate surface adds a shallow triangle, and all four parts add weld metal. Multiply the area by the weld length to get the volume, and by the density of steel (7.85 g per cubic cm) to get the weight of weld metal in the joint.
The second step is deposition efficiency: the share of the electrode or wire that actually becomes weld metal. Stick electrodes lose metal to the stub end left in the holder, to slag and to spatter, so only about 60 to 65 percent of a SMAW electrode ends up in the joint. Solid MIG wire loses only spatter, around 92 to 99 percent ends up deposited, and TIG filler rod loses almost nothing, around 94 to 97 percent. Dividing the weld metal weight by the efficiency gives the electrode or wire to buy, which is the number that matters for ordering and cost.
The third step, heat input, is about the metallurgy rather than the material. Arc energy is the electrical energy of the arc per millimetre of weld, and heat input is the share of it that actually enters the joint, set by the thermal efficiency of the process (0.8 for SMAW and GMAW, 0.6 for GTAW, to EN 1011-1). Heat input controls the cooling rate, and with it the hardness of the heat-affected zone, which is why welding procedure specifications set limits on it. If the steel is a higher-carbon grade, check its weldability first with the Carbon Equivalent Calculator, which works out the IIW carbon equivalent and the Pcm cracking parameter from the mill certificate chemistry.
Fillet weld cross-sectional area (sq mm) = 0.5 x leg size squared
Fillet weld effective throat (mm) = leg size x 0.7071
Butt weld (single V) cross-sectional area (sq mm) = t x (tan b x t) + g x t + (W x h) / 2, where b is half the included groove angle, t is the plate thickness, g is the root gap, W = 2 x (tan b x t) + g is the cap width, and h is the cap height
Butt weld effective throat (mm) = plate thickness (full penetration)
Weld metal volume (cu cm) = cross-sectional area (sq mm) x weld length (mm) / 1,000
Weld metal weight (kg) = volume (cu cm) x 7.85 / 1,000
Electrode or wire consumed (kg) = weld metal weight (kg) / deposition efficiency
Estimated cost ($) = electrode or wire consumed (kg) x price ($ per kg)
Arc energy (kJ/mm) = voltage (V) x current (A) x 60 / (travel speed (mm/min) x 1,000)
Heat input (kJ/mm) = thermal efficiency (k) x arc energy
Deposition efficiency used by this calculator: SMAW 65 percent (published range 60-65 percent), GMAW 95 percent (published range 92-99 percent), GTAW 97 percent (published range 94-97 percent). Thermal efficiency k to EN 1011-1: SMAW 0.8, GMAW 0.8, GTAW 0.6. Steel density 7.85 g per cubic cm. Weight in pounds uses 1 kg = 2.20462 lb.
Note on terminology: in American codes (ASME Section IX, AWS D1.1) the term heat input is often used for the unadjusted arc energy, while in EN 1011-1 heat input means the efficiency-adjusted value. This calculator shows both figures and labels them, so either usage can be read off directly.
A fillet weld with a 6 mm leg, 10 m long, welded with GMAW (MIG) solid wire at 5 dollars per kg, at 24 V, 180 A and a travel speed of 300 mm/min. All steps below use the unrounded values; displayed figures are rounded to two decimals (three for heat input) only at the end.
Cross-sectional area = 0.5 x 6 squared = 18.00 sq mm.
Effective throat = 6 x 0.7071 = 4.2426 mm, displayed as 4.24 mm.
Weld metal volume = 18 x 10,000 / 1,000 = 180.00 cu cm.
Weld metal weight = 180 x 7.85 / 1,000 = 1.413 kg, displayed as 1.41 kg (3.12 lb).
Electrode consumed = 1.413 / 0.95 = 1.4874 kg, displayed as 1.49 kg (3.28 lb).
Estimated cost = 1.4874 x 5 = 7.44 dollars, displayed as $7.44.
Arc energy = 24 x 180 x 60 / (300 x 1,000) = 0.864 kJ/mm.
Heat input = 0.8 x 0.864 = 0.6912 kJ/mm, displayed as 0.691 kJ/mm.
So the joint holds 1.41 kg of weld metal, and about 1.49 kg of MIG wire has to be bought to deposit it, costing about $7.44 at the placeholder price. The same joint welded with stick electrodes at 65 percent efficiency needs 2.17 kg and costs $10.87, and with TIG at 97 percent needs 1.46 kg and costs $7.28.
Because a stick electrode is not fully consumed. About 5 cm of every rod is left as a stub in the holder and thrown away, and the flux coating becomes slag on the weld instead of weld metal, so only 60 to 65 percent of the electrode weight ends up in the joint. MIG wire is fed continuously with no stub loss and no flux, so 92 to 99 percent of it is deposited and only spatter is lost. For the worked example above, the same 1.41 kg of weld metal needs 2.17 kg of stick electrode but only 1.49 kg of MIG wire.
Arc energy is the electrical energy the arc delivers per millimetre of weld: voltage times current times 60, divided by travel speed times 1,000, in kJ/mm. Heat input is the part of that energy that actually enters the joint, so it multiplies the arc energy by the thermal efficiency of the process: 0.8 for SMAW and GMAW, 0.6 for GTAW, to EN 1011-1. At 24 V, 180 A and 300 mm/min the arc energy is 0.864 kJ/mm and the heat input with MIG is 0.691 kJ/mm. Note that American codes often call the unadjusted arc energy “heat input”; this calculator shows both and labels them.
Add a contingency of 10 to 20 percent on top of the calculated consumption. The calculator works from neat geometry, but real joints have wider root gaps than drawn, welders run beads slightly oversize, and some welds need grinding out and rework. The contingency also covers the difference between the published deposition efficiency and what a particular operator and setup achieve. For a large job, run a trial length and weigh the electrode used against the length welded to calibrate the figure.
Because the weld metal fills more than the V between the bevels. The root gap between the plate edges is filled full thickness, and the reinforcement cap above the plate surface adds a shallow triangle across the full width of the groove opening. In the TWI worked example (25 mm plate, 3 mm root gap, 65 degree included angle, 2 mm cap), the two bevel triangles give 3.98 sq cm, the root gap adds 0.75 sq cm and the cap adds 0.35 sq cm, for a total of 5.08 sq cm per metre of weld. Leaving the cap out would understate the weld metal by about 7 percent.
The geometry and the heat input formulas are the same, but the weight will be wrong, because the calculator uses the density of carbon steel, 7.85 g per cubic cm. Aluminium is about 2.70 g per cubic cm, so an aluminium weld weighs roughly a third as much for the same volume, and austenitic stainless steel is about 7.92 g per cubic cm, close to carbon steel. The deposition efficiencies also differ by alloy and process. For non-steel work, use the volume figure from this calculator and multiply by the density of the alloy being welded.
This calculator gives estimates from neat joint geometry and published typical deposition efficiencies. Real electrode and wire consumption varies with fit-up, root gap, bead size, operator technique, rework and the consumable brand, and the heat input depends on the actual arc voltage, current and travel speed, which vary along a weld. The price is a placeholder and must be replaced with the supplier’s price. Do not use these results as the sole basis for a quotation or a welding procedure: check the weld size and the heat input limits against the welding procedure specification for the job and add a contingency when ordering consumables.